The Program Update Loader allows the user to quickly assign, edit, or remove program codes to groups of students at one time.

Video How-to

Program Update Loader video

How-to

  1. In the left navigation panel of WebPams, click Student Master, then Loaders, then Program Update Loader.
  2. At the setup box, set the usual items of Year, District, and School. Other setup items are described in the next steps.
  3. Active Only: Normally set to checked. This means only students currently enrolled will show on the student listing.
  4. As of Date: Normally set to current date. This is the enrolled date used to determine which active students will show on the listing.
  5. Grade: Leave blank if all grade levels are desired. If specific grade levels are needed, click in the field and select the desired grade level(s).
  6. Program Codes: Leave blank if students with any program code is desired. If students with specific program codes are desired, click to select the program codes to limit students displayed.
  7. Filter Dates: Only needed if the user wishes to limit students who have program begin/end dates within a specified date range. If not needed, leave blank.
  8. Post Dates: Can be left blank if the user is loading program codes only. However, if the user wishes to load begin and end dates to the programs assigned to students, enter the begin date and end date here.
    • Note: Not all program codes need an end date. End dates can be blank. Check with your data coordinator for correct use of the end date with programs in your school/district.
  9. Click OK to begin the loader.
  10. A student can have up to 14 programs associated with the student. The user can scroll to the right on the screen to see that there are 14 sets of columns that follow the pattern below:
    • "PO0", "Beg Date0", "End Date0" (This represents row 1 of a student's program screen)
    • "PO1", "Beg Date1", "End Date1" (This represents row 2 of a student's program screen)
    • "PO2", "Beg Date2", "End Date2" (This represents row 3 of a student's program screen)
    • "PO3", "Beg Date3", "End Date3" (This represents row 4 of a student's program screen)
      Pattern continues to...
    • "PO13", "Beg Date13", "End Date13" (This represents row 14 of a student's program screen)
  11. To load a program code to a selected group of students (and begin / end dates if entered in setup box), select a set of columns that do not have data to be overwritten, such as columns PO5 or so.
  12. Click in the PO5 cell, or other desired cell, for the student(s) who are to have this program code.