Difference between revisions of "ACT regular"
From EDgearWiki
Jump to navigationJump to searchLine 8: | Line 8: | ||
− | For Step 5, when the file is downloaded from act.org, there is now an option for a STEM file, so under Options and then Filter, uncheck the STEM filter. If this is done then the file will load correctly using the "ACT 2019" Test Name. | + | |
+ | For '''Step 5''', when the file is downloaded from act.org, there is now an option for a STEM file, so under Options and then Filter, uncheck the STEM filter. If this is done then the file will load correctly using the "ACT 2019" Test Name. | ||
[[File:act 5.png]] | [[File:act 5.png]] |
Revision as of 09:53, 5 May 2022
For Step 5, when the file is downloaded from act.org, there is now an option for a STEM file, so under Options and then Filter, uncheck the STEM filter. If this is done then the file will load correctly using the "ACT 2019" Test Name.
NOTE: Districts should never use the state "ACT Contract" option and only use the "All ACT" option for import into JCampus.